2 Mr.Dinesh Kathriarchhchi-SIEMENS PCS for Energy Storage Application and Case Study.pdf
SIEMENS PCSEnergy ConversionApril 2019 RC-CN MC GMC Siemens.comSiemens AG 2019 Siemens AG 2019 4/27/2019 PCI Business for APAC MarketPage 2 INDEXSIEMENS PCS Overview1 Reference Map & Case Studies2345 6 Siemens AG 2019 4/27/2019 PCI Business for APAC MarketPage 3 INDEXSIEMENS PCS Overview12345 6 Siemens AG 20191) Filter depending on inverter type2) DC devices can in some cases also be directly connected to DC bus bar, depending on the overall concept AC sourcesDC sourcesStoragefuelcellH 2O2 H2OLoads Gridfilter1) filter1)2)2) Power Conversion mGrid filter1) ~ =filter1) ==H 2 ~= ~= ~=~ = == == Typ. motor moduleTyp. active infeed Grid CodesEnergy conversion in voltage and frequency will be the backbone of future supply and distribution concepts 4/27/2019 PCI Business for APAC MarketPage 4 Siemens AG 2019 4/27/2019 PCI Business for APAC MarketPage 5 What is PCI from SIEMENS?Power Conversion InfrastructureGrid = DC AC ~ ~ AC DC =BatteryOr other kinds of Storage Media Grid= DC AC ~Capacitor Grid= DC AC ~Ship Grid= DC AC ~Energy Storage STATCOM On-shore Power Special ConversionGrid= DC AC ~ Battery Or other kinds of Storage Media= DC DC =PV Power Siemens AG 2019 4/27/2019 PCI Business for APAC MarketPage 6 Where to use PCI? OPSBESS STATCOM Drive Siemens AG 2019 4/27/2019 PCI Business for APAC MarketPage 7 Vertically Integrated Supply Chain PCI Application Center for APAC Product SalesSales Channel : To System Integrators Application Centre : Provides Technical Know How on how to integrate SINAMICS S120, DCP application requirements** Solution does not include battery system or responsibility for batteries.System SalesSales Channel : OEM and End UserApplication Centre : Provides complete engineered system including E-Container, Master Control Panel, Interface EngineeringExtended System Sales incl. Digitalisation**Sales Channel : OEM, End UserApplication Centre : Collaborates with other SIEMENS divisions (such as EM and CS) to provide Energy Management System and life cycle maintenance contracts. Siemens AG 2019 4/27/2019 PCI Business for APAC MarketPage 8 Standard offerings1. Standard PCI Cabinet design.• With optimized cost and component selection.• Optimize handling costs and factory planning• Localization 2. Standard PCI Primary Controller.• Add customer value with high feature set.• Digital twin concept• Innovation to support grid applications• Position as a market leader for technology• Enabler for high profitability 3. Standard Container Design.Engineering and handling cost reduction by standardization. Siemens AG 2019 4/27/2019 PCI Business for APAC MarketPage 9 PCI Core Product Portfolio PCI – Power Conversion InfrastructureInt. Product Power Range 30 kW 100 / 200 kW 300 / 600 / 900 kW - 3MW (Parallel) 950 / 1200 kW- 4.5 MW (Parallel) 1200 /1400 kW- 5.3 MW (Parallel)AC Voltage 3 AC 320 -10 % . 3 AC 480 +10 % 3 AC 500 -10 % . 3 AC 690 +10 % 3 AC 500 -10 % . 3 AC 690 +10 %DC Voltage 520~780V (Max. 800V)520~780V (Max. 800V)520~780V (Max. 800V) 750~1100V (Max. 1380V) 750~1100V (Max. 1380V)Topology AC/DC AC/DC AC/DC AC/DC AC/DCIP Class IP20 IP 20 IP20 - IP54Cooling Air-cooling Air-cooling Air-cooling Air-cooling Liquid-cooling Siemens AG 2019 Primary Controller : DIGITAL TWIN DESIGN CONCEPT : DIGITAL WORLD TO REAL WORLDStandardised Primary Controller Interface Design Based S7-1500üStandardised controller interface for STATCOM & BESSüData monitoring capability and future MindShere connectivity Page 10 Siemens AG 2019 Primary Controller System Modelling & FDS Siemens AG 2019 4/27/2019 PCI Business for APAC MarketPage 12 INDEXSIEMENS PCS Overview1 Reference Map & Case Studies2345 6 Siemens AG 2019 4/27/2019 PCI Business for APAC MarketPage 13 Global Know How & CoverageThree Application Centers to cover global marketsApplication Center Nuremberg, GermanyFor Europe Market Beijing, ChinaFor APAC Market Atlanta, USFor American Market Siemens AG 2019 Reference Map – Power Conversion Infrastructure Global Installation 4/27/2019 PCI Business for APAC MarketPage 14 Siemens AG 2019 4/27/2019 PCI Business for APAC MarketPage 15 Case Study – PCS : Frequency RegulationChina : • AGC Response Support• Automatic Generation Control (AGC) to assist with power plant mechanical generators time lag during AGC controlEurope :• Primary Control Reserve (PCR) for frequency Regulation (+-10mHz, less than 15 seconds)• Secondary Control Reserve (SCR) for energy balance (typically ~4hours or more) UK : • Fast Frequency Regulation (FFR)Australia : • Frequency Control Ancillary Services (FCAS) – AEMO , 6second, 6 second and 6 minitue Siemens AG 2019 Power System Inertia & Frequency Regulation :vMechanical generators have inertia due to large spinning rotor.vMechanical inertia provides power system inertia necessary for slow rate of change of frequency in case of load/generation fluctuations. vMechanical governor takes some time (seconds) to restores the speed to the original set point. vRate of Change of Frequency Control (RoCoF Control). http://ccc.centers.ufl.edu/sites/default/files/files/background.pdf Siemens AG 2019 4/27/2019 PCI Business for APAC MarketPage 17 Case Study : Frequency Regulation – AGC supportGuangzhou FR –AGC Control – BESS – 9MWEnd User Guangzhou Huarun Thermal Power PlantLocation Guangzhou, ChinaFunctional Requirements§ Frequency Regulation Customer Benefits§ faster power response time(98.2%)§ completing inverter protection and alarm system§ based on Industry Frequency Converter Platform§ Improve frequency regulation ability of Power Generator, Increase operation efficiency of Power Generator.Siemens First BESS Ancillary Service Projects in China Siemens AG 2019 § Customer: Narada§ Location: Singapore Industrial ParkProject Details:• PCS:20MW• Battery Capicity:160MWh Functional Requirements§ Peak Shaving§ Power demand management§ High reliablity 27-Apr-19Page 18 Reference CaseWuxi Industry Park– BESS – 20MW/160MWh Siemens AG 2019 Australia – Weak Grid Connection RequirementsAEMO Regulations : Rate of Change of Frequency Control , PSCAD, PSSE Models OTR Regulations : Inertia Support 4/27/2019 PCI Business for APAC MarketPage 19 Case Study : SIEMENS PCS - Weak Grid Siemens AG 2019 Typical transmission network for a country-Australia vAustralia – not entire country is interconnected. vMany microgids (Diesel or Gas generation)vSome states (e.g. South Australia) have very high renewable energy installations.More than 50% renewable energy – Need special attention!!!Source : AEMO Siemens AG 2019 Synchronous Generator Synchronous MachinevHas very high moment of inertia (combined with the mechanical turbine)vHas very high short circuit current (low impedance)vReactive power control by adjusting the field excitation currentvFrequency controlled by the driving engine speed (fuel). Siemens AG 2019 Inverter as Virtual Synchronous GeneratorSINAMICS S02 : Grid Droop Control“Virtual Synchronous Generator”Key features:üArtificial “Synthetic” InertiaüHigh overload / short circuit current (upto approx 200% for 1second) üArtificial impedance for starting large loadsüBlack StartüSoft energization of TransformersüPower oscillation dampingüLoad Harmonic damping Siemens AG 2019 § End User: Power Utility§ Location: Perenjori, Western AustraliaProject Details:Utility scale BESS to improve the supply reliability by providing backup power supply to the town of Perenjori in isolation from the network supply in case of network interruptions. Functional Requirements§ Reliability function-Islanded operation§ Battery charging from network§ System frequency supporthttps://www.youtube.com/watch?v=1_p3TtG326s 27-Apr-19Page 23 Strengths§ Liquid Cooled Inverters that provide removal of approx. 95% of heat losses to externally mounted heat exchanger (greater efficiency). This results in low HVAC requirements within outdoor enclosure, as compared to air cooled inverter configuration. § Fully enclosed dust proof enclosures. § Siemens Service Support, local Centre in Perth.§ Voltage regulation in unbalanced network § Strong application know-how. Reference CasePerenjori – BESS – 2.4MW/1.1MWh Siemens AG 2019 § End User: Territory Generation§ Location: Alice Springs, Northern TerritoryProject Details:The battery array, 5MW with 40 minutes of storage is designed to cover the variability of solar generation, particularly as clouds pass over the solar arrays. It a response to some of the grid management issues that Territory Generation was experiencing in Alice Springs, which has the highest solar penetration in AustraliaFunctional Requirements§ Provide frequency control ancillary services (FCAS)§ Enable reduction of spinning reserve from gas generators§ Smooth the impact of variable solar generation, thereby also enabling further penetration of solar PV on the network§ Provide peak shaving in order to defer transmission system upgrades§ Provide reactive power and voltage control at the local bushttps://player.vimeo.com/video/210792675?title=0&byline=0&portrait=0 27-Apr-19Page 24 Strengths§ System designed to have ability to augment the storage capacity with further batteries in the future§ Sized to provide reactive power balance capability§ Voltage regulation in unbalanced network § Energy dense design in rugged containerised solution with small footprint in harsh conditions “That will mean a significant reduction in the amount of gas burned for electricity, and will mean significantly less “spinning reserve” is needed. That will also mean a big reduction in Co2 emissions.” –Tim Duignan TG CEO Reference CaseTerritory Generation– BESS – 6MW/2MWh Siemens AG 2019 Thanks Prepared by Mr Dinesh KathriarachchiHead PCI APC ASIA PACMs Yi LiuPCD Product Manager, LD P China 4/27/2019 PCI Business for APAC MarketPage 25