solarbe文库
首页 solarbe文库 > 资源分类 > PDF文档下载

2 Mr.Dinesh Kathriarchhchi-SIEMENS PCS for Energy Storage Application and Case Study.pdf

  • 资源大小:5.14MB        全文页数:25页
  • 资源格式: PDF        下载权限:游客/注册会员/VIP会员    下载费用:8金币 【人民币8元】
游客快捷下载 游客一键下载
会员登录下载
下载资源需要8金币 【人民币8元】

邮箱/手机:
温馨提示:
支付成功后,系统会根据您填写的邮箱或者手机号作为您下次登录的用户名和密码(如填写的是手机,那登陆用户名和密码就是手机号),方便下次登录下载和查询订单;
特别说明:
请自助下载,系统不会自动发送文件的哦;
支付方式: 微信支付    支付宝   
验证码:   换一换

 
友情提示
2、本站资源不支持迅雷下载,请使用浏览器直接下载(不支持QQ浏览器)
3、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰   
4、下载无积分?请看这里!
积分获取规则:
1充值vip,全站共享文档免费下;直达》》
2注册即送10积分;直达》》
3上传文档通过审核获取5积分,用户下载获取积分总额;直达》》
4邀请好友访问随机获取1-3积分;直达》》
5邀请好友注册随机获取3-5积分;直达》》
6每日打卡赠送1-10积分。直达》》

2 Mr.Dinesh Kathriarchhchi-SIEMENS PCS for Energy Storage Application and Case Study.pdf

SIEMENS PCSEnergy ConversionApril 2019 RC-CN MC GMC Siemens.comSiemens AG 2019 Siemens AG 2019 4/27/2019 PCI Business for APAC MarketPage 2 INDEXSIEMENS PCS Overview1 Reference Map Case Studies2345 6 Siemens AG 2019 4/27/2019 PCI Business for APAC MarketPage 3 INDEXSIEMENS PCS Overview12345 6 Siemens AG 20191 Filter depending on inverter type2 DC devices can in some cases also be directly connected to DC bus bar, depending on the overall concept AC sourcesDC sourcesStoragefuelcellH 2O2 H2OLoads Gridfilter1 filter122 Power Conversion mGrid filter1 filter1 H 2 Typ. motor moduleTyp. active infeed Grid CodesEnergy conversion in voltage and frequency will be the backbone of future supply and distribution concepts 4/27/2019 PCI Business for APAC MarketPage 4 Siemens AG 2019 4/27/2019 PCI Business for APAC MarketPage 5 What is PCI from SIEMENSPower Conversion InfrastructureGrid DC AC AC DC BatteryOr other kinds of Storage Media Grid DC AC Capacitor Grid DC AC Ship Grid DC AC Energy Storage STATCOM On-shore Power Special ConversionGrid DC AC Battery Or other kinds of Storage Media DC DC PV Power Siemens AG 2019 4/27/2019 PCI Business for APAC MarketPage 6 Where to use PCI OPSBESS STATCOM Drive Siemens AG 2019 4/27/2019 PCI Business for APAC MarketPage 7 Vertically Integrated Supply Chain PCI Application Center for APAC Product SalesSales Channel To System Integrators Application Centre Provides Technical Know How on how to integrate SINAMICS S120, DCP application requirements** Solution does not include battery system or responsibility for batteries.System SalesSales Channel OEM and End UserApplication Centre Provides complete engineered system including E-Container, Master Control Panel, Interface EngineeringExtended System Sales incl. Digitalisation**Sales Channel OEM, End UserApplication Centre Collaborates with other SIEMENS divisions such as EM and CS to provide Energy Management System and life cycle maintenance contracts. Siemens AG 2019 4/27/2019 PCI Business for APAC MarketPage 8 Standard offerings1. Standard PCI Cabinet design. With optimized cost and component selection. Optimize handling costs and factory planning Localization 2. Standard PCI Primary Controller. Add customer value with high feature set. Digital twin concept Innovation to support grid applications Position as a market leader for technology Enabler for high profitability 3. Standard Container Design.Engineering and handling cost reduction by standardization. Siemens AG 2019 4/27/2019 PCI Business for APAC MarketPage 9 PCI Core Product Portfolio PCI – Power Conversion InfrastructureInt. Product Power Range 30 kW 100 / 200 kW 300 / 600 / 900 kW - 3MW Parallel 950 / 1200 kW- 4.5 MW Parallel 1200 /1400 kW- 5.3 MW ParallelAC Voltage 3 AC 320 -10 . 3 AC 480 10 3 AC 500 -10 . 3 AC 690 10 3 AC 500 -10 . 3 AC 690 10 DC Voltage 520780V Max. 800V520780V Max. 800V520780V Max. 800V 7501100V Max. 1380V 7501100V Max. 1380VTopology AC/DC AC/DC AC/DC AC/DC AC/DCIP Class IP20 IP 20 IP20 - IP54Cooling Air-cooling Air-cooling Air-cooling Air-cooling Liquid-cooling Siemens AG 2019 Primary Controller DIGITAL TWIN DESIGN CONCEPT DIGITAL WORLD TO REAL WORLDStandardised Primary Controller Interface Design Based S7-1500Standardised controller interface for STATCOM BESSData monitoring capability and future MindShere connectivity Page 10 Siemens AG 2019 Primary Controller System Modelling FDS Siemens AG 2019 4/27/2019 PCI Business for APAC MarketPage 12 INDEXSIEMENS PCS Overview1 Reference Map Case Studies2345 6 Siemens AG 2019 4/27/2019 PCI Business for APAC MarketPage 13 Global Know How CoverageThree Application Centers to cover global marketsApplication Center Nuremberg, GermanyFor Europe Market Beijing, ChinaFor APAC Market Atlanta, USFor American Market Siemens AG 2019 Reference Map – Power Conversion Infrastructure Global Installation 4/27/2019 PCI Business for APAC MarketPage 14 Siemens AG 2019 4/27/2019 PCI Business for APAC MarketPage 15 Case Study – PCS Frequency RegulationChina AGC Response Support Automatic Generation Control AGC to assist with power plant mechanical generators time lag during AGC controlEurope Primary Control Reserve PCR for frequency Regulation -10mHz, less than 15 seconds Secondary Control Reserve SCR for energy balance typically 4hours or more UK Fast Frequency Regulation FFRAustralia Frequency Control Ancillary Services FCAS – AEMO , 6second, 6 second and 6 minitue Siemens AG 2019 Power System Inertia Frequency Regulation vMechanical generators have inertia due to large spinning rotor.vMechanical inertia provides power system inertia necessary for slow rate of change of frequency in case of load/generation fluctuations. vMechanical governor takes some time seconds to restores the speed to the original set point. vRate of Change of Frequency Control RoCoF Control. http//ccc.centers.ufl.edu/sites/default/files/files/background.pdf Siemens AG 2019 4/27/2019 PCI Business for APAC MarketPage 17 Case Study Frequency Regulation – AGC supportGuangzhou FR –AGC Control – BESS – 9MWEnd User Guangzhou Huarun Thermal Power PlantLocation Guangzhou, ChinaFunctional Requirements Frequency Regulation Customer Benefits faster power response time98.2 completing inverter protection and alarm system based on Industry Frequency Converter Platform Improve frequency regulation ability of Power Generator, Increase operation efficiency of Power Generator.Siemens First BESS Ancillary Service Projects in China Siemens AG 2019 Customer Narada Location Singapore Industrial ParkProject Details PCS20MW Battery Capicity160MWh Functional Requirements Peak Shaving Power demand management High reliablity 27-Apr-19Page 18 Reference CaseWuxi Industry Park– BESS – 20MW/160MWh Siemens AG 2019 Australia – Weak Grid Connection RequirementsAEMO Regulations Rate of Change of Frequency Control , PSCAD, PSSE Models OTR Regulations Inertia Support 4/27/2019 PCI Business for APAC MarketPage 19 Case Study SIEMENS PCS - Weak Grid Siemens AG 2019 Typical transmission network for a country-Australia vAustralia – not entire country is interconnected. vMany microgids Diesel or Gas generationvSome states e.g. South Australia have very high renewable energy installations.More than 50 renewable energy – Need special attentionSource AEMO Siemens AG 2019 Synchronous Generator Synchronous MachinevHas very high moment of inertia combined with the mechanical turbinevHas very high short circuit current low impedancevReactive power control by adjusting the field excitation currentvFrequency controlled by the driving engine speed fuel. Siemens AG 2019 Inverter as Virtual Synchronous GeneratorSINAMICS S02 Grid Droop Control“Virtual Synchronous Generator”Key featuresArtificial “Synthetic” InertiaHigh overload / short circuit current upto approx 200 for 1second Artificial impedance for starting large loadsBlack StartSoft energization of TransformersPower oscillation dampingLoad Harmonic damping Siemens AG 2019 End User Power Utility Location Perenjori, Western AustraliaProject DetailsUtility scale BESS to improve the supply reliability by providing backup power supply to the town of Perenjori in isolation from the network supply in case of network interruptions. Functional Requirements Reliability function-Islanded operation Battery charging from network System frequency supporthttps//www.youtube.com/watchv1_p3TtG326s 27-Apr-19Page 23 Strengths Liquid Cooled Inverters that provide removal of approx. 95 of heat losses to externally mounted heat exchanger greater efficiency. This results in low HVAC requirements within outdoor enclosure, as compared to air cooled inverter configuration. Fully enclosed dust proof enclosures. Siemens Service Support, local Centre in Perth. Voltage regulation in unbalanced network Strong application know-how. Reference CasePerenjori – BESS – 2.4MW/1.1MWh Siemens AG 2019 End User Territory Generation Location Alice Springs, Northern TerritoryProject DetailsThe battery array, 5MW with 40 minutes of storage is designed to cover the variability of solar generation, particularly as clouds pass over the solar arrays. It a response to some of the grid management issues that Territory Generation was experiencing in Alice Springs, which has the highest solar penetration in AustraliaFunctional Requirements Provide frequency control ancillary services FCAS Enable reduction of spinning reserve from gas generators Smooth the impact of variable solar generation, thereby also enabling further penetration of solar PV on the network Provide peak shaving in order to defer transmission system upgrades Provide reactive power and voltage control at the local bushttps//player.vimeo.com/video/210792675title0byline0portrait0 27-Apr-19Page 24 Strengths System designed to have ability to augment the storage capacity with further batteries in the future Sized to provide reactive power balance capability Voltage regulation in unbalanced network Energy dense design in rugged containerised solution with small footprint in harsh conditions “That will mean a significant reduction in the amount of gas burned for electricity, and will mean significantly less “spinning reserve” is needed. That will also mean a big reduction in Co2 emissions.” –Tim Duignan TG CEO Reference CaseTerritory Generation– BESS – 6MW/2MWh Siemens AG 2019 Thanks Prepared by Mr Dinesh KathriarachchiHead PCI APC ASIA PACMs Yi LiuPCD Product Manager, LD P China 4/27/2019 PCI Business for APAC MarketPage 25

注意事项

本文(2 Mr.Dinesh Kathriarchhchi-SIEMENS PCS for Energy Storage Application and Case Study.pdf)为本站会员(灰色旋律)主动上传,solarbe文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知solarbe文库(发送邮件至401608886@qq.com或直接QQ联系客服),我们立即给予删除!

温馨提示:如果因为网速或其他原因下载失败请重新下载,重复下载不扣分。

copyright@ 2008-2013 solarbe文库网站版权所有
经营许可证编号:京ICP备10028102号-1

1
收起
展开