solarbe文库
首页 solarbe文库 > 资源分类 > PDF文档下载

Delivering Multi-GWs of Bankable PV Modules - JinkoSolar, Daniel Chang

  • 资源大小:2.32MB        全文页数:18页
  • 资源格式: PDF        下载权限:游客/注册会员/VIP会员    下载费用:5金币 【人民币5元】
游客快捷下载 游客一键下载
会员登录下载
下载资源需要5金币 【人民币5元】

邮箱/手机:
温馨提示:
支付成功后,系统会根据您填写的邮箱或者手机号作为您下次登录的用户名和密码(如填写的是手机,那登陆用户名和密码就是手机号),方便下次登录下载和查询订单;
特别说明:
请自助下载,系统不会自动发送文件的哦;
支付方式: 微信支付    支付宝   
验证码:   换一换

 
友情提示
2、本站资源不支持迅雷下载,请使用浏览器直接下载(不支持QQ浏览器)
3、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰   
4、下载无积分?请看这里!
积分获取规则:
1充值vip,全站共享文档免费下;直达》》
2注册即送10积分;直达》》
3上传文档通过审核获取5积分,用户下载获取积分总额;直达》》
4邀请好友访问随机获取1-3积分;直达》》
5邀请好友注册随机获取3-5积分;直达》》
6每日打卡赠送1-10积分。直达》》

Delivering Multi-GWs of Bankable PV Modules - JinkoSolar, Daniel Chang

UTILITY | COMMERCIAL | RESIDENTIAL JINKOSOLAR.US JINKOSOLAR DELIVERING MULTI-GWS OF BANKABLE PV MODULES PRESENTER Daniel Chang, Technical Director LOCATION Penang, Malaysia DATE October 23, 2018 CONTENTS JinkoSolar CONFIDENTIAL JINKOSOLAR.US 1 Introduction 2 Addressing Today’s Market 3 Plans For Tomorrow JINKOSOLAR.US MAJOR MILESTONES 200 6 20 10 20 11 20 13 20 14 JinkoSolar Co., Ltd. established Listed on New York Stock Exchange Opened USA office Reached 1 GW module manufacturing capacity Offered 125 million convertible senior notes Reached 1 GW shipped globally Created world’s first framed 85℃/85RH PID free module Reached 3 GW module manufacturing capacity Reached 3.5 GW shipped Raised 400 million bonds, notes, and equity offerings Launched module manufacturing facility in South Africa Reached 6 GW shipped Launched module manufacturing facility in Malaysia Signed strategic collaboration agreement with DuPont Reached 17 GW shipped, 3.5 GW deployed in U.S. Best selling module globally in 2016 22 GW shipped globally SVTC Leader 33 GW shipped globally Bifacial product launch Large cell module Cheetah to achieve 400W Established factory in Jacksonville, Florida, USA 20 15 20 16 20 17 20 18 JinkoSolar CONFIDENTIAL JINKOSOLAR.US WORLDWIDE PRESENCE 33 Subsidiaries 80 Countries Sold to 12,000 Employees Manufacturing Facilities Jacksonville, United States Penang, Malaysia Cape Town, South Africa Moura, Portugal Shangrao, China Haining, China Xinjiang, China 9,00 0 9,00 0 5,00 0 9,00 0 WORLDWIDE CAPACITY* Ingot Wafer Cell Module 1 in Global Shipments *As of June 30, 2018 Expected to be 9.7, 9.7, 7.0, 10.8 GW by 2018E JinkoSolar CONFIDENTIAL JINKOSOLAR.US EXTENSIVE VETTING Initial Certification 3rd Party Testing Jinko Quality Assurance IE Onsite Quality Control UL, IEC, etc. DNV GL, RETC, TUV, etc. 0.0972 Claim Rate BV, CEA, SolarBuyer, etc. JinkoSolar CONFIDENTIAL JINKOSOLAR.US MOST BANKABLE Bankability Survey 100 of banks, EPCs, IPPs, and 3rd party labs rated Jinko bankable Used in most non-recourse debt financed projects globally since July 2016 TC600 DH2000 DML1000, TC50, HF10 PID 192h JinkoSolar CONFIDENTIAL JINKOSOLAR.US TOP PERFORMER DNV GL TEST Top Performer Top Performer Top Performer Top Performer JinkoSolar is 1 of 2 manufacturers in the world to appear as Top Performer in all tests of 2017 2018 Scorecard and receive 100 in the BNEF survey. PV Module Reliability Scorecard Report 2018 UTILITY | COMMERCIAL | RESIDENTIAL JINKOSOLAR.US RELIABILITY TESTING Conventional Testing TC200 LID PID Dynamic Loading Mechanical Loading TC HF DH LETID – Light and Elevated Temperature Induced Degradation UTILITY | COMMERCIAL | RESIDENTIAL JINKOSOLAR.US LETID Visual and EL per IEC 61215 Electroluminescence test of each module Connect each module to a maximum power point MPPT load 1000 W/m2 light source stabilized modules at 75C /- 2 C 20-22 hours to achieve a light dose of 20-22 kwh/m2 at 75C /-2 C Disconnect temperature sensor and MPPT load Allow modules to cool to 25 /- 2C Flash at STC Four additional cycles to achieve a total light dose of 100-110 kwh/m2 Visual and EL per IEC 61215 JinkoSolar CONFIDENTIAL JINKOSOLAR.US BOS DUE DILIGENCE JinkoSolar CONFIDENTIAL JINKOSOLAR.US DUPONT/JINKO PARTNERSHIP  Silicon Valley Toxics Coalition ranking of responsible PV module producers  Leader Category score 90/100  High marks on  Worker rights, health, and safety  Enforceable commitment to protect the environment  Reduction of toxic materials  Extended producer responsibility  Emissions reporting  Reduction in water usage JinkoSolar CONFIDENTIAL JINKOSOLAR.US RESPONSIBLE MANUFACTURING JinkoSolar CONFIDENTIAL JINKOSOLAR.US CONTINUOUS GLOBAL GROWTH 249 339 581 789 1600 2068 2015302 489 660 915 1716 2884 2794 335 519 708 1135 1606 2374 302 586 838 1710 1733 2481 762 1157 1612 2535 3209 3947.8 0 500 1000 1500 2000 2500 3000 3500 4000 4500 0 2000 4000 6000 8000 10000 12000 2012 2013 2014 2015 2016 2017 2018 Q1 MW Q2 MW Q3 MW Q4 MW YTD Revenue MW Global Shipments 12 Global Market Share, 1 in Shipments since 2016 0 2000 4000 6000 8000 10000 12000 14000 16000 2013 2014 2015 2016 2017 2018E 2019E 2020E 2021E Resi Comm Util ITC Cliff Section 201 Uncertainty UTILITY | COMMERCIAL | RESIDENTIAL JINKOSOLAR.US US MARKET GROWTH 2013 2014 2015 2016 2017 2018E 2019 2020 2021 3.14 9.92 22.4 16.5 21.0 TBD TBD TBD TBD 0.95 3.10 4.20 5.71 3.15 TBD TBD TBD TBD 0.00 0.00 0.00 3.80 6.25 TBD TBD TBD TBDUS Mark et Share R C U ITC Safe Harbor should create larger market Source Wood Mackenzie UTILITY | COMMERCIAL | RESIDENTIAL JINKOSOLAR.US FACTORY EXPANSION UTILITY | COMMERCIAL | RESIDENTIAL JINKOSOLAR.US JACKSONVILLE, FLORIDA  First to announce US factory after Section 201  Production to begin Q4 2018  400 MW fully automated assembly UTILITY | COMMERCIAL | RESIDENTIAL JINKOSOLAR.US ROADMAP 72M/CHEETAH 370 375 380 385 390 395 400 405 410 415 Power Roadmap Wp Basic Main Power HCLRF Main Power HCLRFW.E Main Power H2-’18 H1-’19 H2-’19 H1-’20 H2-’20 UTILITY | COMMERCIAL | RESIDENTIAL JINKOSOLAR.US

注意事项

本文(Delivering Multi-GWs of Bankable PV Modules - JinkoSolar, Daniel Chang)为本站会员(光伏小萝莉)主动上传,solarbe文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知solarbe文库(发送邮件至401608886@qq.com或直接QQ联系客服),我们立即给予删除!

温馨提示:如果因为网速或其他原因下载失败请重新下载,重复下载不扣分。

copyright@ 2008-2013 solarbe文库网站版权所有
经营许可证编号:京ICP备10028102号-1

1
收起
展开