solarbe文库
首页 solarbe文库 > 资源分类 > PDF文档下载

MICROGRID DEVELOPMENT IN CALIFORNIA

  • 资源大小:2.78MB        全文页数:16页
  • 资源格式: PDF        下载权限:游客/注册会员/VIP会员    下载费用:5金币 【人民币5元】
游客快捷下载 游客一键下载
会员登录下载
下载资源需要5金币 【人民币5元】

邮箱/手机:
温馨提示:
支付成功后,系统会根据您填写的邮箱或者手机号作为您下次登录的用户名和密码(如填写的是手机,那登陆用户名和密码就是手机号),方便下次登录下载和查询订单;
特别说明:
请自助下载,系统不会自动发送文件的哦;
支付方式: 微信支付    支付宝   
验证码:   换一换

 
友情提示
2、本站资源不支持迅雷下载,请使用浏览器直接下载(不支持QQ浏览器)
3、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰   
4、下载无积分?请看这里!
积分获取规则:
1充值vip,全站共享文档免费下;直达》》
2注册即送10积分;直达》》
3上传文档通过审核获取5积分,用户下载获取积分总额;直达》》
4邀请好友访问随机获取1-3积分;直达》》
5邀请好友注册随机获取3-5积分;直达》》
6每日打卡赠送1-10积分。直达》》

MICROGRID DEVELOPMENT IN CALIFORNIA

MICROGRID DEVELOPMENT IN CALIFORNIA THOMAS C. TSENG, PE. CEM SOUTHERN CALIFORNIA EDISON KEY BENEFITS FROM MICROGRID Enhance Reliability and Resiliency Support Clean Energy Pathway initiatives BETE Integrate of exiting and new DER resources Reduce TD infrastructure OM Cost Serve as a grid resource and generate additional revenue from ancillary services. 2 POLICY DRIVERS GOALS IN CALIFORNIA 2020 GHG Emission to 1990 Level 1.3GW of Energy Storage Solar Panel Mandate in Residential Title 24 2025 1.5M Zero Emission Vehicles 2030 GHG emissions reduced to 40 of 1990 Level Double energy efficiency savings by 50 5M ZEV 2045 100 retail electricity supplied by renewable and zero carbon resources 3 Distributed Resource Plan R.14- 08-013 Increase penetration of DER Develop pilots to demonstration utility as DSO to manage DER resources on MGs Other related proceedings R.14-08-013 DRPs Proceeding R.15-03-011 Energy Storage Proceeding R.11-09-011 Interconnection Proceeding Reliability and Resiliency Wildfire Prevention Electric infrastructure upgrade Wild fire prevention and monitoring Demand side management GHG Reduction Clean energy resources DERincluding Transportation Electrification and Energy Storage Building Electrification Affordability Legislation and regulatory efforts Renovate cost recovery mechanism Innovated utility rate structure MARKET BARRIER - Cost and complexity to enable interoperability of legacy and new microgrid assets - Lack of clarity on the value of enhanced reliability - Interconnection requirement vary according to the location of the microgrid and by the type and size of assets - Public safety concerns have the potential to slow down or stall microgrid penetration 4 - Lack of clarity on the islanding requirements for microgrids and DERS - Present regulations do not allow behind the meter resources direct wholesale access, thus depriving microgrids of a value steam the technology is capable of accessing Source and Credit CEC Publication 500-2015-071 COST STUDY Segment IQR Mean Campus/Instit utional 4.93-2.47M 3.3M CI 5.35-3.40M 4.08M Community 3.33-1.43M 2.12M Utility 3.22-2.32M 2.55M Lev el IQR Mean Lv 1 2.86-0.93M 1.98M Lv 2 4.87-2.18M 3.46M Lv 3 3.82-1.94M 3.05M Lv 4 5.14-3.73M 4.44M Lv 5 3.70M-2.92M 3.31M /MW by Technology Level* /MW by Segment Type* * Data Source Credit NREL/Navigant, Phase I Microgrid Cost Study, 2018 FUTURE GRID COMMUNITY MICROGRID Community Microgrid Interconnection and Grid Control System integrity and maintenance cost Cost fairness and cost sharing by other rate payer on the grid Cost recovery mechanism for and grid asset management for grid investment Enhanced Monitoring Prediction Control - Real Time Situational Awareness - PQ Awareness - Distributed Load Flow Analysis - Automation of Circuit Recognition - Accurate Impedance Modeling - Asset Pairing Modeling - Near-Term DER Forecasting - Long Term DER forecasting - DRP to leverage DERs for Grid Benefit - Fast DER Interconnection Process - Voltage Optimization -Power Flow Optimization - Highly reconfigurable Protection - Bi-directional Protection - Remote communication with relays -Advanced Automation New Distribution System Capabilities DISTRIBUTED ENERGY STORAGE INTEGRATION DESI PILOT 7 2.5 MVA / 3.9 MWh 1st pilot BESS connected to distribution Designed to support grid operations. ENHANCING RELIABILITY BY PREVENTING OVERLOADING 8 IRVINE SMART GRID DEMONSTRATION PROJECT 9 SCE Transformer Bypass Switch Battery Power Conversion Module Residential Units Grid Shark Meter Load Shark Meter CES Unit Battery Power Conversion Module RES Unit 14 homes including ZNE Demand response devices 4 kW/10 kWh Solar PV arrays 3.2 - 3.8 kW 7 homes Demand response devices 25 kW/50 kWh Solar PV arrays 3.2 - 3.8 kW CASE STUDIES 10 CASE STUDY 1 MISSION PRODUCE FACILITY 11 Location Oxnard, California Implementer UET, Powerit Solution Capacity 1.5MW Technical Characteristics 1MW Solar PV Cloud-based Demand Management System 0.5MW/2MWh Flow Battery Cost 1M Flow Battery Primary Drivers Bill Savings/Demand Charge Abatement Renewable Energy Integration Reduction of carbon footprint Secondary Drivers Resiliency Provision of energy and capacity services Provision of ancillary services CASE STUDY 2 INLAND EMPIRE WASTE WATER TREATMENT PLANT 12 Location San Bernardino, California Implementer Advance MG Solution, Sun Power, Tesla, EnerNoc Capacity 13.5MW Technical Characteristics 3.5MW Solar PV 1MW Turbine 2.8MW Fuel Cell3.65MW Li-ion battery2.5MW Diesel AMS Armada load control and DR system Cost Cost recovered through capital to operation conversion. Primary Drivers Bill Savings/Demand Charge Abatement Renewable Energy Integration Provision of ancillary services Secondary Drivers Resiliency Provision of energy and capacity services Reduce Carbon Footprint Linkage to Virtual Power Plant CASE STUDY 3 THACHER SCHOOL 13 Location Ojai, California Implementer JLM Energy Capacity 1MW Technical Characteristics 750kW Solar PV 250kW Li-ion Microgrid Controls Cost 4.33M Primary Drivers Bill Savings/Demand Charge Abatement Reduce Carbon Footprint Renewable Energy Integration Linkage to Virtual Power Plant Secondary Drivers Reliability Future transactive energy revenue Provision of energy and capacity services CASE STUDY 4 THOUSAND OAKS REAL ESTATE PORTFOLIO PROJECT 14 Location Thousand Oaks, California Implementer CleanSpark, Jacobs Capacity 2.4MW Technical Characteristics 2MW New 1.7MW Existing Solar PV 440kW/900kWh Li-ion flow batteries Existing BMS Cost 7.9M Primary Drivers Bill Savings/Demand Charge Abatement Provision of energy and capacity services Linkage to Virtual Power Plant Provision of ancillary services Secondary Drivers Future transactive energy revenue Reduce Carbon Footprint Renewable Energy Integration CASE STUDY 5 POOLE HYDRO DRP 3 DEMONSTRATION PROJECT 15 Location Eastern Sierra, California Implementer SCE USMC Capacity 11MW Technical Characteristics 11MW New Existing Solar PV Sizable Energy Storage Systems BTM Smart Inverters Cost TBD Primary Drivers Reliability and Resiliency Provision of energy and capacity services Renewable Energy Integration Provision of ancillary services Secondary Drivers Future transactive energy revenue Reduce Carbon Footprint Linkage to virtual power plant THANK YOU Thomas.tsengsce.com

注意事项

本文(MICROGRID DEVELOPMENT IN CALIFORNIA)为本站会员(光伏小萝莉)主动上传,solarbe文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知solarbe文库(发送邮件至401608886@qq.com或直接QQ联系客服),我们立即给予删除!

温馨提示:如果因为网速或其他原因下载失败请重新下载,重复下载不扣分。

copyright@ 2008-2013 solarbe文库网站版权所有
经营许可证编号:京ICP备10028102号-1

1
收起
展开