solarbe文库
首页 solarbe文库 > 资源分类 > PDF文档下载

IEC62446-2009并网光伏发电系统-系统文件、投运测试和检查的最低要求

  • 资源大小:387.41KB        全文页数:13页
  • 资源格式: PDF        下载权限:游客/注册会员/VIP会员    下载费用:5金币 【人民币5元】
游客快捷下载 游客一键下载
会员登录下载
下载资源需要5金币 【人民币5元】

邮箱/手机:
温馨提示:
支付成功后,系统会根据您填写的邮箱或者手机号作为您下次登录的用户名和密码(如填写的是手机,那登陆用户名和密码就是手机号),方便下次登录下载和查询订单;
特别说明:
请自助下载,系统不会自动发送文件的哦;
支付方式: 微信支付    支付宝   
验证码:   换一换

 
友情提示
2、本站资源不支持迅雷下载,请使用浏览器直接下载(不支持QQ浏览器)
3、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰   
4、下载无积分?请看这里!
积分获取规则:
1充值vip,全站共享文档免费下;直达》》
2注册即送10积分;直达》》
3上传文档通过审核获取5积分,用户下载获取积分总额;直达》》
4邀请好友访问随机获取1-3积分;直达》》
5邀请好友注册随机获取3-5积分;直达》》
6每日打卡赠送1-10积分。直达》》

IEC62446-2009并网光伏发电系统-系统文件、投运测试和检查的最低要求

IEC 62446 Edition 1.0 2009-05 INTERNATIONAL STANDARD NORME INTERNATIONALE Grid connected photovoltaic systems – Minimum requirements for system documentation, commissioning tests and inspection Systmes photovoltaques connects au rseau lectrique – Exigences minimales pour la documentation du systme, les essais de mise en service et l’examen INTERNATIONAL ELECTROTECHNICAL COMMISSION COMMISSION ELECTROTECHNIQUE INTERNATIONALE T ICS 27.160 PRICE CODE CODE PRIX ISBN 978-2-88910-712-4 Registered trademark of the International Electrotechnical Commission Marque dpose de la Commission Electrotechnique Internationale This is a preview - click here to buy the full publication – 2 – 62446 IEC2009 CONTENTS FOREWORD.4 INTRODUCTION.6 1 Scope and object7 2 Normative references .7 3 Terms and definitions .7 4 System documentation requirements 8 4.1 General .8 4.2 System data 8 4.2.1 Basic system information.8 4.2.2 System designer information .8 4.2.3 System installer information.9 4.3 Wiring diagram 9 4.3.1 General .9 4.3.2 Array - general specifications 9 4.3.3 PV string information .9 4.3.4 Array electrical details .9 4.3.5 Earthing and overvoltage protection 9 4.3.6 AC system.10 4.4 Datasheets10 4.5 Mechanical design information 10 4.6 Operation and maintenance information 10 4.7 Test results and commissioning data.10 5 Verification .10 5.1 General .10 5.2 General .11 5.3 Inspection .11 5.3.1 General .11 5.3.2 DC system inspection 11 5.3.3 Protection against overvoltage / electric shock 12 5.3.4 AC system.12 5.3.5 Labelling and identification 12 5.4 Testing13 5.4.1 General .13 5.4.2 Continuity of protective earthing and/or equipotential bonding conductors.13 5.4.3 Polarity test .13 5.4.4 PV string - open circuit voltage measurement13 5.4.5 PV string - current measurement .14 5.4.6 Functional tests .15 5.4.7 PV array Insulation resistance test 15 5.5 Verification reports 17 5.5.1 General .17 5.5.2 Initial verification .17 5.5.3 Periodic verification .17 Annex A informative Model verification certificate18 Annex B informative Model inspection report .19 This is a preview - click here to buy the full publication 62446 IEC2009 – 3 – Annex C informative Model PV array test report 21 Annex D informative PV array infrared camera inspection procedure.23 Table 1 – Minimum values of insulation resistance17 This is a preview - click here to buy the full publication – 4 – 62446 IEC2009 INTERNATIONAL ELECTROTECHNICAL COMMISSION ____________ GRID CONNECTED PHOTOVOLTAIC SYSTEMS – MINIMUM REQUIREMENTS FOR SYSTEM DOCUMENTATION, COMMISSIONING TESTS AND INSPECTION FOREWORD 1 The International Electrotechnical Commission IEC is a worldwide organization for standardization comprising all national electrotechnical committees IEC National Committees. The object of IEC is to promote international co-operation on all questions concerning standardization in the electrical and electronic fields. To this end and in addition to other activities, IEC publishes International Standards, Technical Specifications, Technical Reports, Publicly Available Specifications PAS and Guides hereafter referred to as “IEC Publications”. Their preparation is entrusted to technical committees; any IEC National Committee interested in the subject dealt with may participate in this preparatory work. International, governmental and non- governmental organizations liaising with the IEC also participate in this preparation. IEC collaborates closely with the International Organization for Standardization ISO in accordance with conditions determined by agreement between the two organizations. 2 The formal decisions or agreements of IEC on technical matters express, as nearly as possible, an international consensus of opinion on the relevant subjects since each technical committee has representation from all interested IEC National Committees. 3 IEC Publications have the form of recommendations for international use and are accepted by IEC National Committees in that sense. While all reasonable efforts are made to ensure that the technical content of IEC Publications is accurate, IEC cannot be held responsible for the way in which they are used or for any misinterpretation by any end user. 4 In order to promote international uniformity, IEC National Committees undertake to apply IEC Publications transparently to the maximum extent possible in their national and regional publications. Any divergence between any IEC Publication and the corresponding national or regional publication shall be clearly indicated in the latter. 5 IEC provides no marking procedure to indicate its approval and cannot be rendered responsible for any equipment declared to be in conformity with an IEC Publication. 6 All users should ensure that they have the latest edition of this publication. 7 No liability shall attach to IEC or its directors, employees, servants or agents including individual experts and members of its technical committees and IEC National Committees for any personal injury, property damage or other damage of any nature whatsoever, whether direct or indirect, or for costs including legal fees and expenses arising out of the publication, use of, or reliance upon, this IEC Publication or any other IEC Publications. 8 Attention is drawn to the Normative references cited in this publication. Use of the referenced publications is indispensable for the correct application of this publication. 9 Attention is drawn to the possibility that some of the elements of this IEC Publication may be the subject of patent rights. IEC shall not be held responsible for identifying any or all such patent rights. International Standard IEC 62446 has been prepared by IEC technical committee 82 Solar photovoltaic energy systems. The text of this standard is based on the following documents FDIS Report on voting 82/558A/FDIS 82/564/RVD Full information on the voting for the approval of this standard can be found in the report on voting indicated in the above table. This publication has been drafted in accordance with the ISO/IEC Directives, Part 2. This is a preview - click here to buy the full publication 62446 IEC2009 – 5 – The committee has decided that the contents of this publication will remain unchanged until the maintenance result date indicated on the IEC web site under “http//webstore.iec.ch“ in the data related to the specific publication. At this date, the publication will be reconfirmed, withdrawn, replaced by a revised edition, or amended. This is a preview - click here to buy the full publication – 6 – 62446 IEC2009 INTRODUCTION Grid connected PV systems are expected to have a lifetime of decades, with maintenance or modifications likely at some point over this period. Building or electrical works in the vicinity of the PV array are very likely, for example roof works adjacent to the array or modifications structural or electrical to a home that has a PV system. The ownership of a system may also change over time, particularly for systems mounted on buildings. Only by the provision of adequate documentation at the outset can the long term performance and safety of the PV system and works, on or adjacent to the PV system, be ensured. This standard is split into 2 parts System documentation requirements Clause 4 – This clause details the information that shall be provided, as a minimum, within the documentation provided to the customer following the installation of a grid connected PV system. Verification Clause 5 – This clause provides the information expected to be provided following initial or periodic verification of an installed system. It includes requirements for inspection and testing. This is a preview - click here to buy the full publication 62446 IEC2009 – 7 – GRID CONNECTED PHOTOVOLTAIC SYSTEMS – MINIMUM REQUIREMENTS FOR SYSTEM DOCUMENTATION, COMMISSIONING TESTS AND INSPECTION 1 Scope and object This International Standard defines the minimal information and documentation required to be handed over to a customer following the installation of a grid connected PV system. This standard also describes the minimum commissioning tests, inspection criteria and documentation expected to verify the safe installation and correct operation of the system. The document can also be used for periodic retesting. This standard is written for grid connected PV systems only and not for AC module systems or systems that utilize energy storage e.g. batteries or hybrid systems. NOTE It is expected that additional information and commissioning tests will be required in some circumstances, e.g. for large commercial installations. This standard is for use by system designers and installers of grid connected solar PV systems as a template to provide effective documentation to a customer. By detailing the expected minimum commissioning tests and inspection criteria, it is also intended to assist in the verification / inspection of a grid connected PV system after installation and for subsequent re-inspection, maintenance or modifications. 2 Normative references The following referenced documents are indispensable for the application of this standard. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document including any amendments applies. IEC 60364 all parts, Low-voltage electrical installations IEC 60364-6, Low-voltage electrical installations – Part 6 Verification IEC 60364-7-7122002, Electrical installations of buildings – Part 7-712 Requirements for special installations or locations – Solar photovoltaic PV power supply systems IEC/TR 607552008, General requirements for residual current operated protective devices IEC 61557 all parts, Electrical safety in low voltage distribution systems up to 1000 V AC and 1500 V DC – Equipment for testing, measuring or monitoring of protective measures IEC 61730-1, Photovoltaic PV module safety qualification – Part 1 Requirements for construction 3 Terms and definitions For the purposes of this document, the following terms and definitions apply 3.1 verification all measures by means of which compliance of the electrical installation to the relevant standards is checked This is a preview - click here to buy the full publication – 26 – 62446 CEI2009 SOMMAIRE AVANT-PROPOS28 INTRODUCTION.30 1 Domaine dapplication et objet31 2 Rfrences normatives.31 3 Termes et dfinitions 32 4 Exigences relative la documentation du systme .32 4.1 Gnralits32 4.2 Donnes systme32 4.2.1 Informations systme de base .32 4.2.2 Informations du concepteur systme .33 4.2.3 Informations pour l’installateur systme.33 4.3 Schma de cblage.33 4.3.1 Gnralits33 4.3.2 Panneau - spcifications gnrales .33 4.3.3 Informations sur les chanes PV 33 4.3.4 Dtails lectriques du panneau33 4.3.5 Mise la terre et protection contre les surtensions 34 4.3.6 Rseau courant alternatif34 4.4 Fiches techniques .34 4.5 Informations sur la conception mcanique.34 4.6 Informations sur le fonctionnement et la maintenance .34 4.7 Rsultats d’essai et donnes de mise en service.35 5 Vrification .35 5.1 Gnralits35 5.2 Gnralits35 5.3 Examen.35 5.3.1 Gnralits35 5.3.2 Examen du rseau courant continu.35 5.3.3 Protection contre les surtensions / chocs lectriques.36 5.3.4 Rseau courant alternatif37 5.3.5 Etiquetage et identification 37 5.4 Essais .37 5.4.1 Gnralits37 5.4.2 Continuit des conducteurs de mise la terre de protection et/ou de liaison quipotentielle38 5.4.3 Essai de polarit38 5.4.4 Chane PV – mesure de la tension en circuit ouvert.38 5.4.5 Chane PV – mesure du courant 39 5.4.6 Essais de fonctionnement40 5.4.7 Essai de rsistance d’isolement des panneaux PV 40 5.5 Rapports de vrification.42 5.5.1 Gnralits42 5.5.2 Vrification initiale .42 5.5.3 Vrification priodique.43 Annexe A informative Certificat de vrification modle 44 Annexe B informative Rapport dexamen modle.45 This is a preview - click here to buy the full publication 62446 CEI2009 – 27 – Annexe C informative Rapport dessai du panneau PV modle47 Annexe D informative Mthode d’examen du panneau PV par camra infrarouge49 Tableau 1 – Valeurs minimales de rsistance d’isolement.42 This is a preview - click here to buy the full publication – 28 – 62446 CEI2009 COMMISSION LECTROTECHNIQUE INTERNATIONALE ____________ SYSTMES PHOTOVOLTAQUES CONNECTS AU RSEAU LECTRIQUE – EXIGENCES MINIMALES POUR LA DOCUMENTATION DU SYSTME, LES ESSAIS DE MISE EN SERVICE ET L’EXAMEN AVANT-PROPOS 1 La Commission Electrotechnique Internationale CEI est une organisation mondiale de normalisation compose de lensemble des comits lectrotechniques nationaux Comits nationaux de la CEI. La CEI a pour objet de favoriser la coopration internationale pour toutes les questions de normalisation dans les domaines de llectricit et de llectronique. A cet effet, la CEI – entre autres activits – publie des Normes internationales, des Spcifications techniques, des Rapports techniques, des Spcifications accessibles au public PAS et des Guides ci-aprs dnomms “Publications de la CEI“. Leur laboration est confie des comits dtudes, aux travaux desquels tout Comit national intress par le sujet trait peut participer. Les organisations internationales, gouvernementales et non gouvernementales, en liaison avec la CEI, participent galement aux travaux. La CEI collabore troitement avec lOrganisation Internationale de Normalisation ISO, selon des conditions fixes par accord entre les deux organisations. 2 Les dcisions ou accords officiels de la CEI concernant les questions techniques reprsentent, dans la mesure du possible, un accord international sur les sujets tudis, tant donn que les Comits nationaux de la CEI intresss sont reprsents dans chaque comit d’tudes. 3 Les Publications de la CEI se prsentent sous la forme de recommandations internationales et sont agres comme telles par les Comits nationaux de la CEI. Tous les efforts raisonnables sont entrepris afin que la CEI sassure de lexactitude du contenu technique de ses publications; la CEI ne peut pas tre tenue responsable de lventuelle mauvaise utilisation ou interprtation qui en est faite par un quelconque utilisateur final. 4 Dans le but dencourager luniformit internationale, les Comits nationaux de la CEI sengagent, dans toute la mesure possible, appliquer de faon transparente les Publications de la CEI dans leurs publications nationales et rgionales. Toutes divergences entre toutes Publications de la CEI et toutes publications nationales ou rgionales correspondantes doivent tre indiques en termes clairs dans ces dernires. 5 La CEI n’a prvu aucune procdure de marquage valant indication d’approbation et nengage pas sa responsabilit pour les quipements dclars conformes une de ses Publications. 6 Tous les utili

注意事项

本文(IEC62446-2009并网光伏发电系统-系统文件、投运测试和检查的最低要求)为本站会员(小马说光伏)主动上传,solarbe文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知solarbe文库(发送邮件至401608886@qq.com或直接QQ联系客服),我们立即给予删除!

温馨提示:如果因为网速或其他原因下载失败请重新下载,重复下载不扣分。

copyright@ 2008-2013 solarbe文库网站版权所有
经营许可证编号:京ICP备10028102号-1

1
收起
展开