solarbe文库
首页 solarbe文库 > 资源分类 > PDF文档下载

George Garabandic DNV GL ESIE 2019 Beijing Rev 3

  • 资源大小:2.71MB        全文页数:9页
  • 资源格式: PDF        下载权限:游客/注册会员/VIP会员    下载费用:6金币 【人民币6元】
游客快捷下载 游客一键下载
会员登录下载
下载资源需要6金币 【人民币6元】

邮箱/手机:
温馨提示:
支付成功后,系统会根据您填写的邮箱或者手机号作为您下次登录的用户名和密码(如填写的是手机,那登陆用户名和密码就是手机号),方便下次登录下载和查询订单;
特别说明:
请自助下载,系统不会自动发送文件的哦;
支付方式: 微信支付    支付宝   
验证码:   换一换

 
友情提示
2、本站资源不支持迅雷下载,请使用浏览器直接下载(不支持QQ浏览器)
3、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰   
4、下载无积分?请看这里!
积分获取规则:
1充值vip,全站共享文档免费下;直达》》
2注册即送10积分;直达》》
3上传文档通过审核获取5积分,用户下载获取积分总额;直达》》
4邀请好友访问随机获取1-3积分;直达》》
5邀请好友注册随机获取3-5积分;直达》》
6每日打卡赠送1-10积分。直达》》

George Garabandic DNV GL ESIE 2019 Beijing Rev 3

Energy Storage Project Experience in South East Asia George Garabandic DNV GL www.dnvgl.com BESS Investment Drivers Regulatory Environment Technical Requirement for mandatory inclusion of ESS Transactional Regulatory Policy, Tariffs for ESS Services 1 BESS Investment Drivers ESS Regulatory Transactional Regulatory for ESS Services, Policy Technical Requirement for mandatory inclusion of ESS Case Study Regulatory Environment in the Philippines 2 Case Study Philippines Ancillary Services Regulatory in the Philippines Wholesale Electricity Spot Market WESM Energy trading platform, Commercial op. since 2006 WESM Market Rules, Chapter 3.3, Ancillary Service Regulating Reserve Contingency Reserve Dispatchable Reserve Ancillary Services in the Grid Code 2016, GO 6.6 Primary Reserve Secondary Reserve Tertial Reserve Ancillary Service Procurement Plan, ERC, 2016 Primary Reserve Secondary Reserve Tertial Reserve Case Study Regulatory Environment in the Philippines 3 Case Study Philippines Actual Ancillary Services Procurement Process Custom ASPA Anc. Serv. Proc. Agr. between Provider and National Grid Corp. Of Ph. NGCP To maintain transparency, contract must be Approval by ERC Example BESS case ORDER No. 2018-010 RC Regulating Reserve 5 year ASPA 20MW -10MW10MW 24h/day 2.20 PhP 0.042USD /kW/h; 0.05PhP 0.001USD /kWh ASPA can override or augment requirements beyond the Grid Code or the Ancillary Service Procurement Plan INVESTEMENT RISK 4 BESS Investment Risk BESS Investment Risk Legal Risk Technical Risk 5y ERC Holdup Service Compliance Check by NGCP Market Risk NGCP Leverage Provisions for SOC management No Performance standard for BESS Requirements by NGCP beyond code INVESTEMENT RISK REDUCTION 5 BESS Risk Management DNO Constraint Management Services Revenue via availability payments Capacity market, TOU, Arbitrage, peak shifting Revenue via energy payments Demand Charge Reductions, Imbalance Risk Hedging, Back up power, Outage mitigation Multiple revenue streams Ancillary Services Frequency Response, Reserve Services Energy Trading Future, day-ahead, intra-day, OTC PPA Service Agreements Delivery Auctions Ramp Rate Control Time Shifting ORIGINAL RISK MANAGEMENT APPROACH Build the BESS plant on barges The country is an archipelagos, move the BESS where there is opportunity Ancillary Services BESS Diesel Generation Solar Integration on Islands Micro Grid Operation 6 Case Study Philippines CONCLUSION 7 BESS Investment Drivers High Risk is not always an obstacle to invest into BESS Innovative Business Models Innovative Risk Management Models 谢谢 Thanks for Your Time George Garabandic George.Garabandicdnvgl.com 65-8299-7154

注意事项

本文(George Garabandic DNV GL ESIE 2019 Beijing Rev 3)为本站会员(泛能网刘敏)主动上传,solarbe文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知solarbe文库(发送邮件至794246679@qq.com或直接QQ联系客服),我们立即给予删除!

温馨提示:如果因为网速或其他原因下载失败请重新下载,重复下载不扣分。

copyright@ 2008-2013 solarbe文库网站版权所有
经营许可证编号:京ICP备10028102号-1

1
收起
展开