solarbe文库
首页 solarbe文库 > 资源分类 > PDF文档下载

单排竖放平单轴跟踪双面组件发电模型-尉元杰-阿特斯太阳能

  • 资源大小:4.36MB        全文页数:29页
  • 资源格式: PDF        下载权限:游客/注册会员/VIP会员    下载费用:5金币 【人民币5元】
游客快捷下载 游客一键下载
会员登录下载
下载资源需要5金币 【人民币5元】

邮箱/手机:
温馨提示:
支付成功后,系统会根据您填写的邮箱或者手机号作为您下次登录的用户名和密码(如填写的是手机,那登陆用户名和密码就是手机号),方便下次登录下载和查询订单;
特别说明:
请自助下载,系统不会自动发送文件的哦;
支付方式: 微信支付    支付宝   
验证码:   换一换

 
友情提示
2、本站资源不支持迅雷下载,请使用浏览器直接下载(不支持QQ浏览器)
3、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰   
4、下载无积分?请看这里!
积分获取规则:
1充值vip,全站共享文档免费下;直达》》
2注册即送10积分;直达》》
3上传文档通过审核获取5积分,用户下载获取积分总额;直达》》
4邀请好友访问随机获取1-3积分;直达》》
5邀请好友注册随机获取3-5积分;直达》》
6每日打卡赠送1-10积分。直达》》

单排竖放平单轴跟踪双面组件发电模型-尉元杰-阿特斯太阳能

Yuanjie.Yu, Jn.Jaubert, Baohua.He System technology centerCanadian Solar Inc. Dec 4th , 2018CSIQ NASDAQ ListedA comparison of bifacial PV system energy yield modeling tools applied to 1P single-axis tracker system 2 Field trial results01 Bifacial system simulation analysis 02 Conclusion 053 3 Bifacial module with leading half-cut cell technologyDouble glass2010 Worldwide leading double glass module manufacturerKu Half-cell2010 Worldwide No. 1 Ku module manufacturer Capacity5GW, Shipment3GWBiKu2017 Worldwide NO.1 manufacturer to offer bifacial Ku poly module, shipment300MWCanadian Solar’s BiKu Based on Eight years’ track record 4 FrontRear State of the art MCCE Metal Catalyzed Chemical Etching PERC structure using ALD Al2 O3 passivation 5 busbar design / MBB multi-busbar 9 Controlled LID/LeTiD Excellent low light response Lower temperature coefficient Enables Bifacial cellsMain CharacteristicsCanadian Solar Poly PERC technology introduction 5 Changshu bifacial field trial overviewChangshu project located in Suzhou, Jiangsu Province, East China, total system size is 28 kWdc.Climate type is typical Humid with hot summer.Latitude39.7Longitude106.8 6 Item Mounting type Module type Module quantity DC capacity Kw InverterProduct type Nominal power MPPT number Max input currentFT1 Single axis tracker1*10 3U-MS-FGsingle facial 10 3.71 GROWATT 1000TL3-S 10kW 2 13AFT2 10 3.70FT3 3U-MB-FGbifacial 10 3.67 10kW 2 13AFT4 10 3.69 FT2FT1 FT3 FT4Single facial bifacial Changshu bifacial field trial basic information Albedo meters Silicon sensor on back side 7 Field trial data cleaning methodologyData processing item DescriptionData source DC related parameters and climate data with 1min intervalBasic outlier filter PArray-DC 5W; POA 20W/m2; Events and missing data Box plot extreme and mild outliers for Power/irradiance Comparison criterion Specific energy yield calculation kWh/kW with front side powerBifacial gain definition 8 Bifacial field trial testing results- Energy yield Data source DC side on field trial platform in Changshu, China. Testing period Feb-Oct, 2018 Monthly albedo During normal operation 231 days, accumulated bifacial gain for the tracker system is 9.5 under average albedo 26.Specific Energy yield kWh/kW 9 Field trial results01 Bifacial system simulation analysis 02 Conclusion 053 10 Canadian Solars own simulation tool, CASSYS Freeware and open-source http//canadiansolar.github.io/CASSYS/ Inputs and underlying model are very similar to PVsyst ❖ Some alternate models are available like spectral correction.❖ Can be run with any time step and in batch mode NREL’s Python code named BifacialVF. Only used for irradiance simulation Freeware and open-source https//github.com/NREL/bifacialvf One of the most popular commercial simulation software tools, PVsyst. Energy modeling methodology-software introduction 11 Simulation VS measurement - Energy yieldBifacial energy yield difference between simulation and measurement can match well within reasonable uncertainty range. ( Sim.-Test/Test CASSYS PVsyst-1.9 2.6 ( Sim.-Test/Test CASSYS PVsyst-0.7 3.6 12 Different simulation approach on backside irradiance and energy yieldMeasured DNI, GHI. Measured Front POA, Monthly Albedo Ambient temperatureSimulation A DNIGHI Simulation BPOA BifacialVF Irradiance and Power simulationIrradiance 13Irradiance VSMeasured DNI, GHI, ( Using Changshu Ambient temperature and Albedo) Measured Front POA, Rear POA, Albedo, Ambient temperature, DC power Irradiance Simulation A DNIGHI comparisonSimulation A Measurement LimitationThe irradiance data in two neighboring places were adopted.Remark Filter the measured POA irradiance difference more than 50W/m2. 14 Simulation A DNIGHI VS measurement- Front POA irradiance Note Model transposition uncertainty2-3 and measured difference between the pyranometer and Si sensor1-3 should be considered, ( Sim.-Meas./Meas.NREL CASSYS PVsyst1.8 3.8 5.2 Three approaches showed reasonable uncertainty expectation on front irradiance simulation. 15 Simulation A DNIGHI VS measurement-Rear POA irradiance( Sim.-Meas./Meas.NREL CASSYS PVsyst10.6 32 24Three approaches showed aggressive results on rear irradiance simulation Additional factors that influence the results need to be studied.MBE Sim.-Meas. 16 sensor Module sensorsensorTube1.5 m 1.3 m 1.4 mSimulation limitation– Backside irradiance sensor height Sensor height difference is one of simulation deviation sources. 17 Average of three sensor irradiance is about 35.6 higher than middle irradiance sensor.sensor Module sensorsensorTube1.5 m 1.3 m 1.4 mRemark Module installation height 1.5m used as simulation input. Measured rear side irradiance heights are 1.4m and 1.3m for edges and middle positons respectively. ( Sim.-Meas./Meas.Approach NREL CASSYS PVsystBefore correction 10.6 32 24After correction -25 -3.6 -11.6After correction, the simulation results become conservative. It is not very easy to match very well.Simulation A DNIGHI VS measurement- Corrected Rear POA irradiance 18 Simulation A DNIGHI VS measurement-Rear POA irradiance 19 Measured Front POA, Albedo, Ambient temperature, DC power Measured Front POA, Monthly Albedo Ambient temperatureVS MeasurementSimulation BSimulation B POA approach comparisonIrradiance and Power Irradiance and Power 20 Simulation B POA approach VS measurement- Rear POA irradiance For rear side irradiance CASSYS and PVsyst are still aggressive( Sim.-Meas./Meas. Approach CASSYS PVsystBefore corrected 24 14After corrected* -11.6 -21.6Remark Average of three sensor irradiance is about 35.6 higher than middle irradiance sensor. Height brings additional uncertainty. 21 Simulation B POA VS measurement - Energy yield 22Irradiance and Power One minutemeasured minutely albedo VSOne hourmeasured hourly albedo One hourmeasured monthly albedoMeasured Front POA, Albedo Ambient temperatureDifferent simulation time intervals comparison Measured Front POA, Rear POA, Albedo, Ambient temperature, DC powerIrradiance and PowerMeasurementSimulationCASSYS can provide alternative time step from 1min to hourly for key parameter input. 23 Different time intervals - Rear POAMinutely simulation results is a little better than hourly and monthly on back irradiance level.( Sim.-Meas./Meas. Time step Minutely albedo Hourly albedo Monthly albedoMBE/AV 22.1 22.7 23.6 24 Different time intervals – Energy yieldSimulation results with different time steps show the same level in energy yield side. Current monthly albedo should be enough for bifacial energy yield simulation. ( Sim.-Meas./Meas.Time step Minutely albedo Hourly albedo Monthly albedoMBE/AV -1.5 -0.8 -1.1 25 Field trial results01 Bifacial system simulation analysis 02 Conclusion 053 26 Conclusion Three simulation approaches NREL,PVsyst,CASSYS seem relatively conservative considering the limitation of sensor type, height, position, etc. Energy yield simulation and measurement in Changshu field match well within reasonable uncertainty range. Rear side simulation under low albedo is not sensitive to energy yield impact. Different time intervals for albedo input are not sensitive under low albedo for bifacial energy yield simulation. 27 Next stepIn order to simulate more accurately next step, we will Set up more accurate irradiance sensor testing system with more reasonable position Simulate through stronger irradiance simulation software like Rhinoceros DIVA Albedo testing method and calculation needs to align the same. Special modules can be made to monitor and verify irradiance non-uniformity on back side. Thanks for continuous contribution to bifacial energy modeling from PVsyst, NREL,SANDIA,CASSYS,. Canadian Solar will share learnings about simulation experience based on more field test data 28 New Field trial testing in WuhaiLocation Mountingtype Module type Module Qty String Qty Invert Remark1-17Red zone Landscape3*6 CS3U-355PB-FG 216 12 SungrowSG80KTL-M The same BOM for bifacial and monofacial moduleCS3U-355P-FG 216 12Total 24 strings Key parameter ValueTilt 35Height above the ground 0.5mfixed)pitch 8mfixedGround albedo 0.3Mounting structure Triangle steel structureFoundation Screw steel tubeCable connection Up and down string connectionBack side irradiance monitoring Ground Albedo monitoringSingle facial module bifacial module 29

注意事项

本文(单排竖放平单轴跟踪双面组件发电模型-尉元杰-阿特斯太阳能)为本站会员(蛐蛐儿)主动上传,solarbe文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知solarbe文库(发送邮件至794246679@qq.com或直接QQ联系客服),我们立即给予删除!

温馨提示:如果因为网速或其他原因下载失败请重新下载,重复下载不扣分。

copyright@ 2008-2013 solarbe文库网站版权所有
经营许可证编号:京ICP备10028102号-1

1
收起
展开